• CBCC Bids

Bid End Date: JULY 08, 2020 SCOTT BLVD. (GARRETT DR - CENTRAL EXPWY) TRAFFIC SIGNAL INTER. & COORDIN

CONTACT: Benison Tran

phone: (408) 615-3016

btran@santaclaraca.gov


DESCRIPTION OF WORK: The Base Work consists of installing traffic signal interconnect conduits and cables along Scott Boulevard, from Garrett Drive to Central Expressway, including installing traffic signal cabinets (City-Provide-Contractor Install) on existing foundations, service enclosures, pull boxes, and fiber optic splicing and testing. Alternative Work consists of installing traffic monitoring camera system and travel time bluetooth reader system. CONTRACT TIME: The Work shall reach Substantial Completion within forty-five (45) Working Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within sixty-five (65) Working Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. REQUIRED CONTRACTORS LICENSE(S): A California A or C-10 contractors license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract


COMMODITY CODES:

NIGP [838-29] Cable, Fiber Optic W/interconnecting Components and Accessories (see Class 280 for Other Communications Cable

NIGP [838-33] Communications: Networking, Linking, Fiber Modems, Power Over Ethernet, Wireless

NIGP [968-83] Traffic Signal Maintenance and Repair



0 views