• CBCC Bids

Bid End Date: SEPTEMBER 22, 2020 KILN PROJECT AT LIVE OAK PARK

CONTACTS: Liana Urrutia

lurrutia@citymb.info


NOTICE INVITING BIDS FOR KILN PROJECT AT LIVE OAK PARK Project Number: D-937 Bid Number: E1251-20C NOTICE IS HEREBY GIVEN that the City of Manhattan Beach, California (City) invites sealed Bids for the Project. The City will receive such Bids at the main entrance of City Hall, 1400 Highland Avenue, Manhattan Beach, California 90266 from 10:30 a.m. to 11:00 a.m. on Tuesday, September 22, 2020. Bids will be publicly opened and read aloud via Zoom meeting on Wednesday, September 23, 2020 at 11:00 a.m. The bid opening will be broadcast at the following link https://comb.zoom.us/j/96664306376 and the deadline to submit questions related to the bid documents is September 8, 2020 at 12:00 p.m . In response to COVID-19, City facilities, including City Hall, are closed to the public. Therefore, sealed Bids for this Project will only be accepted by the City Project Manager present outside the main entrance door of City Hall during the period of time stated above. Bids will NOT be accepted prior to the period of time stated above. Bidders must make the necessary arrangements to physically deliver sealed BIDS to the City Project Manager. There will be no other opportunities or alternative methods considered to submit a Bid for this Project. After 24-hours of contactless document isolation, the sealed Bids will be publicly opened and read aloud by City Clerk staff via a Zoom meeting. The meeting web address and time is stated above. The Bid results will be posted on the City website within 24-hours after the Bid Opening. All Bids must be made on the form furnished by the City. Each Bid must be submitted in a sealed envelope addressed to the City Clerk with the Project name and identification number typed or clearly printed on the lower left corner of the envelope. Bids must remain valid and shall not be subject to withdrawal for 90 calendar Days after the Bid opening date. SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. Time for completion of the Work is 50 total Working Days from the date specified in the Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials. OBTAINING BID DOCUMENTS. Bidders may obtain free copies of the Plans, Specifications and other Contract Documents online by visiting https://www.bidsync.com . OPTIONAL pre-bid meeting AND Site Visit. An optional pre-bid meeting will be held on Thursday, September 3, 2020 at 11:00 a.m. at Live Oak Park Ceramics Studio, 1901 Valley Drive, Manhttan Beach, CA 90266. No allowances for cost adjustments will be made if a Bidder fails to adequately examine the Project site before submitting a Bid. REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with LaborCode Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under LaborCode Section 1771.1(a)]. PREVAILING WAGES. In accordance with LaborCode Section 1770 et seq ., the Project is a public work. The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (DIR) regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works and are available to any interested party upon request. The Contractor shall post a copy of the DIRs determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR. BONDS. Each Bid must be accompanied by a cash deposit, cashiers check, certified check or Bidders Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price, as well as a warranty or maintenance Bond that is valid for one year from Project acceptance in the amount of ten percent of the Contract Price. All Bonds must be issued by a Califor.


COMMODITY CODES:

NIGP [330-13] Fencing, Chain Link (including Fabric, Gates, Panels, Posts and Fittings)

NIGP [405-13] Gas, Natural (incl. Compressed Natural Gas (cng))

NIGP [450-62] Pads, Equipment Foundation, All Types (including Recycled Type)

NIGP [570-76] Steel, Reinforcing, Bars and Rods

NIGP [570-83] Structural Shapes, Other Than Steel: Angles, Channels, I-beams, etc.

NIGP [670-14] Gas Meters, Indicating and Recording

NIGP [765-49] Pneumatic Machines: Demolition Tools, Paving Breakers, Rock Cutters, Tampers, etc. (see 765-80 for Non-pneumatic Tampers)

NIGP [770-60] Roofing, Baked Enamel Sheet Steel: Corrugated, V-crimp, etc.

NIGP [770-65] Roofing, Galvanized Sheet Metal: Corrugated, V-crimp, etc.

NIGP [912-40] Demolition Services

NIGP [914-38] Electrical

0 views